A plague on both your houses!

I got a call from Dougie the electrician yesterday.  “Sorry I haven’t been up this week,” he said.  “I’ve managed to catch ringworm and I’m trying not to go near people as I’m very contagious.”  He’ll be back with us next week, but in the meantime he’s been talking me through filling out the online SSE form to get someone out to have a look at the house and tell me how much it’s going to cost to move the incoming power cable and the meter.  All submitted and they should get back to me in three working days, so fingers crossed it’s not going to be too expensive.  Dougie did get a fair bit done last week, we have another couple of holes in the house, one in the living room where the power cable will go out for a switch for the two floodlights that will illuminate the sheep fanks and one where the new mains power will come in.  The current one is only hanging on by the skin of its teeth!

156 armadale - living room - 13 156 armadale - bedroom two - 11 156 armadale - outside - 21

Actually, it’s no bad thing that he’s not here, because he really needs an accurate drawing of the kitchen units and it hasn’t been done yet.  Mick has a colleague at work who used to work for a kitchen company and still has the design software, so she’s very kindly doing it for us (I’ve asked him to find out what kind of cake she likes!).  David’s also been back working on his neighbour’s extension, so it’s just been Pete and his team working on the roof.

The sarking boards are all replaced where necessary and the slates are now going on.  James has set up a small slate-cutting workshop in the kitchen to hand-cut all the scalloped slates for the ridge row and the patterns.

156 armadale - roof - 1 156 armadale - roof - 2 156 armadale - roof - 3

David realised he hadn’t asked us for enough wood, so the Rembrand lorry came trundling over with another 30 lengths and the guys now have a nice bench to sit and have lunch on.

156 armadale - kitchen - 21

There are some replacement floorboards on the way from Allans of Gillock as well, but they’ve been a bit delayed due to the county show last weekend throwing out their delivery schedule.

Tomorrow I have to turn my attention to the fields again – we are forecast dry weather from tomorrow until Sunday afternoon, so John Angy and his tractor are coming up tomorrow afternoon to cut this little lot for me and hopefully we’ll get it turned on Friday and Saturday and baled on Sunday.  That’s the plan, anyway, let’s hope the weather gods are kind!  It also means I have until Sunday to clear enough space in the byres to store the baled hay with enough air around it for it not to combust and go up in flames.  I suspect I’m in for some hard physical labour for the rest of the week!

20160719_092428

Starting to feel like we’re getting somewhere

I’m not quite sure how it’s got to be Thursday already, but this week has passed in a blur and Pete, James and Connor have got an awful lot done.

The kitchen has been plastered:

156 armadale - kitchen - 18

coated with bitumen:
156 armadale - kitchen - 17

and then the liner was put down and the concrete floor re-poured. Try getting through THAT, damp!!
156 armadale - kitchen - 16

The same’s happened upstairs in bedroom one (minus the floor liner), as that gable end faces the sea and takes a battering:

156 armadale - bedroom one - 21

156 armadale - bedroom one - 20

And they’ve also sorted out that wobbly stone under the window:

156 armadale - bedroom one - 19

and picked and pointed the gable end in bedroom two (I’ve decided to keep that fireplace as bare stone and not put the little surround back in, by the way):

156 armadale - bedroom two - 10

So the inside is more or less ready to hand over to Dougie and David, once the floor’s set in the kitchen – only we’re having trouble tracking down David!  The problem with using someone widely acknowledged to be one of the best joiners in the area is that he’s very in demand.  Pete could really have done with him here this week, but we think he’s been working down at Forsinard where there’s no mobile signal, as no-one’s been able to speak to him.  By ringing his home number at 9pm last night, Pete finally managed to speak to his other half, so fingers crossed he might be able to start with us next week, as Dougie will be back and ideally we want the studwork to go up for the wiring to be run down (and I need to know whether he’s using 3×2 or 2×2 so I know what thickness of insulation to order!)

Outside there’s progress as well.  The scaffolding is up on the back and the roof tiles are off:

156 armadale - outside - 8

156 armadale - outside - 5

156 armadale - outside - 6

That membrane does make it rather blue inside!

156 armadale - bedroom three - 5

And after a long weekend down the road at our neighbour’s house after they were delivered to the wrong address on Friday, Travis Perkins came back on Wednesday and brought the roof slates up:

156 armadale - outside - 7

And, of course, one of the most important bits – care and feeding of your roofing team!  It was cheese and chive flapjacks today:

baking - cheese and chive flapjacks

I also had a visit from ERG today to quote me for the windows and door.  Before they arrived, I looked out the paperwork from when ours were done three years ago and noted that 2 doors and 10 windows came to £8,800 – so considering that I was wanting 1 door and 5 windows, my estimate in the budget of £5,000 seemed about right.  Er, no, their prices have gone up a bit.  List price £8,300, 20% returning customer discount brought it down to £6,640.  I made the time-honoured tradesman ‘suck-through-your-teeth’ noise, he asked how much I was hoping to do it for and we ended up shaking hands at £5,812.  The surveyor should be coming round in the next two weeks to measure up more accurately and then it’s 6-8 weeks for manufacture and delivery, which will be about right for my schedule.  The front door will be dark green outside, white inside and part-glazed.  The windows will be white inside and out, with oak window sills and door and window furniture will be silver.  Once the exterior is painted just off-white, it should look pretty smart!

Tomorrow Callum is coming to sweep the three chimneys.  I’m not sure how many years it is since they were last done, but Derek the heating engineer made the same suck-through-your-teeth noise when he looked up the living room one as we were discussing the woodburner, so I think it’s going to get messy….