Renovation chic

This is not one of my better looks – you know it’s gone badly wrong when the selfie mode on your phone can’t identify a face!!

selfie - 2

You can do a cracking Darth Vader impression in that breathing mask though 🙂  I decided to take a brush to the walls to get as much plaster dust off as possible – one of the reasons the plasterboard in the kitchen and living room was damp at the bottom is because over the years the lime plaster behind it had crumbled off the wall and filled in the gap between wall and plasterboard, making a nice absorbent bridge for any moisture to work its way through.

Anyway, it’s all swept up into rubble sacks, waiting to go to the tip (we have an old Mitsubishi L200, which is tough as old boots, but even it starts to sag if we put more than 10 bags of rubble in the back!) and we’re pretty much good to go with the professionals next week.

Dougie the electrician called in today to see how things were going and to find out when David the joiner would be on site.  When he heard that Pete was hoping to start next week and would have David around, he said he’d stop by too and put in a temporary power supply for them, as it would be safer for them to work with than the existing power.  Hopefully next week we’re going to start making giant strides forwards.

Time to start spending

Pete dropped round yesterday to have a chat about the kitchen fireplace and deliver his quote. “Caroline,” he said.  “On a scale of 1 to 10, how much do you want to open up this fireplace?”  I had a think about it.  “7.5.”  “Ah.  Not a 3 then.”

The fireplace has been causing headaches.  Pete’s consultants have been trying to work out the load on that wall, but because it’s a rubble wall (i.e. constructed out of random sizes of stone) rather than standard bricks or blocks it’s (a) difficult to calculate the weight and (b) difficult to predict how it will behave – because there’s no structure to it, if it starts to collapse then worst-case scenario the whole gable end could come down.

That said, they haven’t said ‘Don’t do it’, it’s more a case of ‘If you do, be very careful’!  They think that an RSJ at the front and back of the fireplace should work (both are needed in case the wall starts to twist), but obviously this is based on best guess.  Insurance-wise, Pete can get an extension to his normal insurance to cover the work.

Mick and I had a chat about it – I knew what my gut instinct was, but wanted to see what he thought, and it turns out we feel the same: if we don’t at least try, then every time we walk into the kitchen and look at that wall we’re going to wish we had.  So I sent Pete a text to say that we would like to go ahead with it, but we don’t want to put pressure on him to do a job he’s uncomfortable about, so if he has reservations then we’ll cover it over again.

Anyway, the quote.  When Pete first looked at the job last year, he said a thumb-in-the-air guesstimate was that a straight roof replacement would be about £12,000 and indeed, that part of the quote has come in at £12,485, including sorting the chimneys out.  However, once you add in the four new Velux conservation-style windows and the joinery work, that goes up to £15,301.80.  On top of that we have separate quotes for the other work we’ve talked about::

Supply and fit new half-round guttering system, including over joist hangers to front and rear £967.00
Pick and point upstairs gable ends internally (I checked, this includes sorting out that loose stone under the bedroom window) £1,172.00
Remove floor section in kitchen, tank to 1m, fit waterproof membrane and re-pour floor £940.00
Re-harl front section of wall after removal of fascia board £340.00

Once they’ve picked the upstairs gable end, it may be decided that we’d be better off tanking it, in which case Pete says he’ll do it for the same price.

Time-wise, they just have to get the ridge tiles on their current job (which they’re not going to manage today, by the looks of the weather!) and finish cleaning up site and then they’ll be over, so their gear should start arriving on site towards the end of next week and then they’ll start the week after – which is when I have to pony up the first third of the bill!

Mick’s big week off

So my lovely husband decided that he needed a week off work, since he hadn’t had any time off yet this year, and last week he put in a massive effort to get the house more or less ready for the trades to start.

He got a little over-enthusiastic in the bathroom – we’ll have to rig up a sheet for some privacy!  Pete, Dougie and David all know each other well, but possibly not THAT well!!

156 armadale - bathroom - 2 156 armadale - bathroom 3 156 armadale - living room - 10

Bedroom one – wall ready for raking out and repointing.  You know that the hot water cylinder was there a long time when there’s a perfectly circular dent in the floorboards.

156 armadale - bedroom one - 16 156 armadale - bedroom one - 17

Studwork removed between the rooms upstairs – that’s standing in bedroom one, looking through bedroom three/the landing to bedroom two.

156 armadale - bedroom one - 18 156 armadale - landing - 1

Lime plaster coming off downstairs.  Still waiting for the final verdict on supporting that lintel, which means it’s not a ‘No’ yet!

156 armadale - kitchen - 15

Living room lime plaster coming off.  I’m sure there are probably better, safer and faster ways to do it than knocking it off by whacking it with a hammer, but I did that wall in the second and third pictures (and about a wall’s-worth in the kitchen) and it’s bloody good fun!  On a more practical note, I am a lot happier with my balance on a stepladder than I was before I started.

156 armadale - living room - 9 156 armadale - living room - 11 156 armadale - living room - 12

He really did pick the right week to take off – we’ve enjoyed some stunning weather here over the past 10 days.

156 armadale - outside - 4

So we are more or less there on the stripping out part of the job.  Upstairs has now been swept up and is ready to go.  Downstairs we still need to bag up and remove the lime plaster on the floor, but decided that a better breathing mask were required first – the filters for it arrived today, so we should be able to get tidied up downstairs by the end of the weekend, particularly since the Rayburn was rehomed today to someone who’s prepared to give it some TLC and restore it (and he very kindly brought us a bottle of whisky to say thank you!).