Frog swallowing

Anyone else swallow frogs?  The saying stems from the thought that one should swallow a live frog first thing every morning on the grounds that nothing worse is likely to happen to you that day (or the frog, for that matter…).  Getting the maps done for the decrofting application has been a frog that’s been growing in size steadily over the past month or two, so last night I held my nose and swallowed it.

I need to ring the Department today (or the Scottish Government Rural Payments and Inspectorate Directorate, to give it its proper name, but SGRPID is tricky to pronounce, so everyone calls it the Department), as they are the representatives of my landlord (the Scottish Ministers) and see if I need an appointment to get a signature on the forms to say they approve of the application or whether I can just drop in.

What else has been happening?  Mick has been working hard on his improvised plasterboard-cutting table

and as a result we have three separate rooms again upstairs, plus Derek and his team have finished laying the underfloor up there.

Last of the insulation going in upstairs

Bathroom ready for the pipework for the shower.

Corner edging in place

We had a Rembrand delivery on Thursday.  Mick had ordered some more plasterboard and the 22mm chipboard sheets to go over the underfloor heating upstairs and had arranged with them to ring my office phone when they were close so I could go down and help unload.  Now, every time they’ve been here in the past, it’s been around 10.30-11am, so when I got down the road at 9.15 to feed the sheep I was a bit surprised to find the order neatly stacked outside the front door.  The problem was that moisture-resistant plasterboard sheets weigh 26kg (or about 57lbs) which is over a third of my bodyweight and we had a fairly stiff breeze of about 35mph coming directly from the south, which meant that the 8×4 plasterboard sheets and 8×2 chipboard sheets (which themselves were about 15kg each) turned into giant sails, blowing me around with them when I picked them up.  After a bit of a false start when I tried to take a plasterboard sheet straight into the living room, got it wedged between the stairs and the front door and had to climb out of the living room window, I got the 8 plasterboard sheets and 30 chipboard sheets inside and stacked up in about 45 minutes.  Seems a winter of heaving 25kg sacks of sheep feed about has its uses!  David’s away at a wedding at the moment, so once he’s back he’ll come and lay this for us, then it’ll be ready for underlay and carpet.

I also had a surprise gift – John, Ethel’s former partner, turned up with this and has refused to take any money for it, because he reckons he put the barn roof on in 1991 and it should have been good for a few years more yet.

For those of you going, ‘What on earth…???’ it’s a Massey Ferguson fingerbar mower (the second blade is in the shed for sharpening) and it means I now have all the equipment I need to make my hay without outside assistance this summer, though I suspect I shall be on the phone to John going, ‘Help!’ the moment something breaks down!

Post-Christmas progress

WARNING:  lots of pictures ahead!

One of the things I forgot to mention in my last post is that the Highland Council decided to give me a Christmas present of putting me back on 200% council tax as of 25th December.  I’ve sent them an email explaining that the house still isn’t done and attaching scans of the latest bunch of invoices and letting them know they can follow progress on this blog, so hello to the Highland Council council tax department if you’re reading this 🙂

So, what’s been happening in the last fortnight?  The stove arrived:

and Pete and James turned up to put the replacement hearthstone in, very, very carefully!

David’s put all the internal studwork back in, has been panelling like a demon and has also replaced all the rotted/woodworm-y floorboards.

We hit a bit of an issue last Friday.  We were forecast gales on Thursday night, not particularly high – gusting to about 65mph or so.  As I was walking down to feed the sheep on Friday morning I saw an SSE van in the village and a flapping power cable.  ‘Wonder what caused that?’ I thought.  The next field I passed was Ronald’s, who lives in the house diagonally opposite Ethel’s.  There appeared to be a heap of twisted metal in it.  ‘Crumbs, some poor sod’s lost their roof,’ I thought.

Er, yes, that poor sod would be me – the haybarn roof had completely gone!

Talking to the SSE guys, they said it looked like it had come off in one piece, bounced off the power cable between Ethel’s house and Ronald’s with such force that it snapped four cables as a result, knocking out power to that end of the village, and then bounced in Ronald’s field, breaking up on impact.  In the picture of the field, you can just make out a piece of wood stuck vertically in the ground to the left of the telegraph pole.  That had driven in over a foot deep.

Mick came home from work and we cleared out all the wood from the stalled byre, finding the chains for tethering the cattle in the process – there’s a selling point!  “If your children misbehave whilst on holiday, simply tether them in our handy cattle stalls…”

And I really must take this sofa to the tip.  Ethel got it for the front room, but decided it was too big, so it’s been living in a cattle stall ever since.

Anyway, the hay is all safe and sound, the wood is in the roofless hay barn and we’ll get a new roof on it once Mick has decided whether or not he’s going to rebuild the front wall, which is bowing out a bit.  Back to the house.

David, bless him, came over on Saturday to finish the last little bits he needed to get done before the heating team started.  I am LOVING the way the bedroom alcoves have turned out – how’s this for a bedroom with a view?

Derek turned up on Monday with his team and Dougie was on hand to wire up the manifold.  Heating is now going in 🙂

Holes are starting to appear for sockets and switches.

And once the pipework is done for the bathroom, the last bit of plasterboarding can be done.

So it’s just finish the heating, get the floor down, install the kitchen and bathroom, decorate it and make a garden.  Easy-peasy, right??

Nearly ready for heat

Happy new year!  I spent it getting plastered…

(Top tip: old bank cards make great miniature floats for skim when you’re filling in plasterboard screw heads!)

Actually, I’ve spent most of the Christmas break concentrating on breathing, as Mick kindly gave me an extra Christmas present of the lurgy going round his workplace, but while I only managed to do a few hours of hole filling, he has spent nearly every day of the holiday down there and has got a LOT done.

Plasterboard and insulation going up in the hall.

The kitchen windowseat has been done as well – just need some edge protector to finish that off.

He even managed to plasterboard the ceiling over the stairs.  I’m not sure I want to know exactly how he managed that – apparently it involved those two lengths of wood poking through the bannisters and a piece of chipboard…

David very kindly gave us some time between Christmas and new year as well, and has made good progress with the panelling upstairs.

And the framing for the internal walls is going back up as well, so it’s starting to look more like a house again and less like a shell.

David has been back this week too, replacing the damaged floorboards and finishing the framing, and Dougie has been finishing up the last bits of electrics needed, so hopefully we’ll be all set to go for Derek and his team to start putting the heating in on Monday 🙂