WARNING:  lots of pictures ahead!

One of the things I forgot to mention in my last post is that the Highland Council decided to give me a Christmas present of putting me back on 200% council tax as of 25th December.  I’ve sent them an email explaining that the house still isn’t done and attaching scans of the latest bunch of invoices and letting them know they can follow progress on this blog, so hello to the Highland Council council tax department if you’re reading this 🙂

So, what’s been happening in the last fortnight?  The stove arrived:

and Pete and James turned up to put the replacement hearthstone in, very, very carefully!

David’s put all the internal studwork back in, has been panelling like a demon and has also replaced all the rotted/woodworm-y floorboards.

We hit a bit of an issue last Friday.  We were forecast gales on Thursday night, not particularly high – gusting to about 65mph or so.  As I was walking down to feed the sheep on Friday morning I saw an SSE van in the village and a flapping power cable.  ‘Wonder what caused that?’ I thought.  The next field I passed was Ronald’s, who lives in the house diagonally opposite Ethel’s.  There appeared to be a heap of twisted metal in it.  ‘Crumbs, some poor sod’s lost their roof,’ I thought.

Er, yes, that poor sod would be me – the haybarn roof had completely gone!

Talking to the SSE guys, they said it looked like it had come off in one piece, bounced off the power cable between Ethel’s house and Ronald’s with such force that it snapped four cables as a result, knocking out power to that end of the village, and then bounced in Ronald’s field, breaking up on impact.  In the picture of the field, you can just make out a piece of wood stuck vertically in the ground to the left of the telegraph pole.  That had driven in over a foot deep.

Mick came home from work and we cleared out all the wood from the stalled byre, finding the chains for tethering the cattle in the process – there’s a selling point!  “If your children misbehave whilst on holiday, simply tether them in our handy cattle stalls…”

And I really must take this sofa to the tip.  Ethel got it for the front room, but decided it was too big, so it’s been living in a cattle stall ever since.

Anyway, the hay is all safe and sound, the wood is in the roofless hay barn and we’ll get a new roof on it once Mick has decided whether or not he’s going to rebuild the front wall, which is bowing out a bit.  Back to the house.

David, bless him, came over on Saturday to finish the last little bits he needed to get done before the heating team started.  I am LOVING the way the bedroom alcoves have turned out – how’s this for a bedroom with a view?

Derek turned up on Monday with his team and Dougie was on hand to wire up the manifold.  Heating is now going in 🙂

Holes are starting to appear for sockets and switches.

And once the pipework is done for the bathroom, the last bit of plasterboarding can be done.

So it’s just finish the heating, get the floor down, install the kitchen and bathroom, decorate it and make a garden.  Easy-peasy, right??

Leave a Reply

Your email address will not be published.