A very big delivery

We’ve made some pretty good progress this week.  Dougie has now got about as far as he can with the electrics until the studwall goes in, but we now have all the cables coming down the walls to where the sockets and switches will be, and they’re all neatly bundled up where the fusebox will be moved to on the landing.

156 armadale - kitchen - 20156 armadale - landing - 2

As we had a bit of bad weather earlier in the week, I asked Pete and the guys to take the kitchen and bathroom ceilings down – Mick strained his back over the weekend so we weren’t able to do it ourselves and I didn’t want it to hold Dougie up.  They found the kitchen ceiling was painted, so at some point it must have just been open to the floorboards above.  I’m very wary about going upstairs now though, as I don’t want to fall through Dougie’s cable runs!

156 armadale - kitchen - 19 156 armadale - bedroom one - 23

We did have our first on-site accident though – a dropped crowbar whilst taking down the bathroom ceiling unfortunately bounced the wrong way off the stepladder and took out the sink.

156 armadale - bathroom - 4

Never mind, it wasn’t a particularly pretty basin, I’m almost pleased to have a good excuse for replacing it!  The bathroom ceiling is nothing to write home about and will be covered up with plasterboard once Dougie has done his stuff.

156 armadale - bathroom - 5

Today is Mick’s birthday and fittingly we had a very, very large delivery – all the Quinn Therm insulation and my flooring 🙂  It took up most of the Rembrand lorry on its weekly trip west!

156 armadale - outside - 9

Amazingly we just about managed to squeeze it all into the living room.  In theory, once David and Dougie have gone through upstairs, we can fit the 100mm stuff into the rafters, which will free up enough space for them to work in the living room.  In theory…!

We’ve had a pretty good day for weather today, which means the roof has made great progress.

156 armadale - outside - 10

Fingers crossed we can get hold of David for next week, otherwise we’re going to grind to a halt again, but for now we’re moving forwards at pace.

Let there be light!

David arrived on Thursday and had a quick site meeting with Pete and Dougie, the upshot of which is that he put the Velux windows in on the side of the house Pete is currently working on and will be back again at some point this week to put the studwork in for Dougie.  I went down on Thursday evening to have a look at the windows and was so pleased that I almost cried!  The amount of light coming into the top floor now is amazing.

20160623_181149 20160623_181518

Dougie is still tunnelling, very neatly.

20160621_084215

And having had a look at our kitchen layout, he’s now more convinced than ever that venting the extractor fans from there and the bathroom through the roof is going to be too much distance for them to work effectively, so he’s having an exploratory dig through the wall to put them out of the back instead.

20160624_171911

I went to Rembrand at the weekend and ordered up the insulation, which came to an eye-watering £1,778.  I keep telling myself that it’s paid for itself once I’ve saved about 4,200 litres of heating oil…  Seriously, as I intend to own this house for a very long time, it’s a good investment.  While we were in there we saw they had an end of line special offer on 18mm engineered oak flooring, so today I’ve been measuring up the ground floor as it looked really nice and at £21.99 a square metre, worth grabbing if they have enough.  (A similar thickness bought online is around £29.99 a square metre.)  Measurements are as follows:

Kitchen – 3.36 x 4.00 into bay window = 13.44sqm
Living room – 3.90 x 4.00 into bay window = 15.6sqm
Hall – 3.20 x 1 plus 1 x 0.52 plus 1.09 x 0.9 = 4.7sqm
Total = 33.74sqm – so I’ll order 35sqm, which will be £769.65 (assuming the price they were showing included VAT…) and if I go and see them tomorrow, it can be delivered with all the insulation on Thursday.
The bathroom will need something different, as engineered wood usually isn’t suitable for use in it, but I measured it anyway – 1.7 x 2.15 to the shower tray = 3.655sqm.

Today we’ve been baking to feed the team next week.  I’ve made a lemon drizzle cake and Mick has gone all in on the sausage rolls after they got rave reviews last week – he’s done sausage, pate, cheese and onion, Mexican-spiced sausage, and wild boar and mushroom!  Also pictured are the custard biscuits I made last week, after I raided Mum’s recipe book while I was away.

20160626_165340 20160626_142838 20160622_210629

Time to start spending

Pete dropped round yesterday to have a chat about the kitchen fireplace and deliver his quote. “Caroline,” he said.  “On a scale of 1 to 10, how much do you want to open up this fireplace?”  I had a think about it.  “7.5.”  “Ah.  Not a 3 then.”

The fireplace has been causing headaches.  Pete’s consultants have been trying to work out the load on that wall, but because it’s a rubble wall (i.e. constructed out of random sizes of stone) rather than standard bricks or blocks it’s (a) difficult to calculate the weight and (b) difficult to predict how it will behave – because there’s no structure to it, if it starts to collapse then worst-case scenario the whole gable end could come down.

That said, they haven’t said ‘Don’t do it’, it’s more a case of ‘If you do, be very careful’!  They think that an RSJ at the front and back of the fireplace should work (both are needed in case the wall starts to twist), but obviously this is based on best guess.  Insurance-wise, Pete can get an extension to his normal insurance to cover the work.

Mick and I had a chat about it – I knew what my gut instinct was, but wanted to see what he thought, and it turns out we feel the same: if we don’t at least try, then every time we walk into the kitchen and look at that wall we’re going to wish we had.  So I sent Pete a text to say that we would like to go ahead with it, but we don’t want to put pressure on him to do a job he’s uncomfortable about, so if he has reservations then we’ll cover it over again.

Anyway, the quote.  When Pete first looked at the job last year, he said a thumb-in-the-air guesstimate was that a straight roof replacement would be about £12,000 and indeed, that part of the quote has come in at £12,485, including sorting the chimneys out.  However, once you add in the four new Velux conservation-style windows and the joinery work, that goes up to £15,301.80.  On top of that we have separate quotes for the other work we’ve talked about::

Supply and fit new half-round guttering system, including over joist hangers to front and rear £967.00
Pick and point upstairs gable ends internally (I checked, this includes sorting out that loose stone under the bedroom window) £1,172.00
Remove floor section in kitchen, tank to 1m, fit waterproof membrane and re-pour floor £940.00
Re-harl front section of wall after removal of fascia board £340.00

Once they’ve picked the upstairs gable end, it may be decided that we’d be better off tanking it, in which case Pete says he’ll do it for the same price.

Time-wise, they just have to get the ridge tiles on their current job (which they’re not going to manage today, by the looks of the weather!) and finish cleaning up site and then they’ll be over, so their gear should start arriving on site towards the end of next week and then they’ll start the week after – which is when I have to pony up the first third of the bill!

Mick’s big week off

So my lovely husband decided that he needed a week off work, since he hadn’t had any time off yet this year, and last week he put in a massive effort to get the house more or less ready for the trades to start.

He got a little over-enthusiastic in the bathroom – we’ll have to rig up a sheet for some privacy!  Pete, Dougie and David all know each other well, but possibly not THAT well!!

156 armadale - bathroom - 2 156 armadale - bathroom 3 156 armadale - living room - 10

Bedroom one – wall ready for raking out and repointing.  You know that the hot water cylinder was there a long time when there’s a perfectly circular dent in the floorboards.

156 armadale - bedroom one - 16 156 armadale - bedroom one - 17

Studwork removed between the rooms upstairs – that’s standing in bedroom one, looking through bedroom three/the landing to bedroom two.

156 armadale - bedroom one - 18 156 armadale - landing - 1

Lime plaster coming off downstairs.  Still waiting for the final verdict on supporting that lintel, which means it’s not a ‘No’ yet!

156 armadale - kitchen - 15

Living room lime plaster coming off.  I’m sure there are probably better, safer and faster ways to do it than knocking it off by whacking it with a hammer, but I did that wall in the second and third pictures (and about a wall’s-worth in the kitchen) and it’s bloody good fun!  On a more practical note, I am a lot happier with my balance on a stepladder than I was before I started.

156 armadale - living room - 9 156 armadale - living room - 11 156 armadale - living room - 12

He really did pick the right week to take off – we’ve enjoyed some stunning weather here over the past 10 days.

156 armadale - outside - 4

So we are more or less there on the stripping out part of the job.  Upstairs has now been swept up and is ready to go.  Downstairs we still need to bag up and remove the lime plaster on the floor, but decided that a better breathing mask were required first – the filters for it arrived today, so we should be able to get tidied up downstairs by the end of the weekend, particularly since the Rayburn was rehomed today to someone who’s prepared to give it some TLC and restore it (and he very kindly brought us a bottle of whisky to say thank you!).

A tale of two fireplaces

The weather here today has been completely horrible – sleet, snow, hail and wind.  In other words, not ideal conditions for getting up on a roof, so Pete and his crew abandoned their current job up the road in Strathy and came to have a look at our fireplaces.

One end went REALLY well – this is what the living room fireplace now looks like:
156 armadale - living room - 8

Those stones will clean up nicely with a wire brush, Pete will repair the back with matching stone and I’m going to try and find an old oak beam to put above the lintel – the plan is to box around it with the plasterboard and leave the stone exposed.  Although there’s a hearthstone there, the floor level’s going to be raised up with the underfloor heating, so if we can find a big enough bit of Caithness flagstone (or two bits to go side by side), we’re going to use that, as Pete says he can fit it for us – but has warned me that the three exposed edges need to be natural, not cut, otherwise it won’t look right.  We’ve got a couple of bits here and a friend of Mick’s has got some he’s willing to let us have, so hopefully we can find one or two pieces that work.

In the kitchen, things haven’t quite gone to plan.  The guys got the Rayburn moved out of the way and the fireplace was revealed in all its glory (husband included for scale! – he’s 5’7″)
156 armadale - kitchen - 9

Pete carefully chipped out a corner of the rubble – it’s 17″ from the front of the lintel to the back wall of the house!
156 armadale - kitchen - 10

BUT we have two enormous load cracks in the lintel (one shown below, the other is a mirror image).  Pete is doing the calculations to work out if we can still break it out by inserting a big sheet of steel into the wall under the lintel to support it – essentially functioning as an RSJ, but less visible.  Fingers crossed!
156 armadale - kitchen - 11

Another find down the back of the Rayburn – this looks handcarved.
156 armadale - kitchen - 12

Damp corner.  The concrete floor is going to be cut back, the wall tanked, a new membrane put down on the floor going up the wall and then the floor re-poured.
156 armadale - kitchen - 13

I don’t know what wood this is, but it’s obviously tasty!
156 armadale - kitchen - 14 

Yet another vintage wallpaper, this time in the bathroom.
156 armadale - bathroom - 1

Mick has made a temporary sign for deliveries – 75p of stick-on letters and a bit of wood and two screws that came out of the house!
156 armadale - outside 3

Making progress

So we’re pretty much there with stripping out the upstairs – you can now see right the way through from one end to the other.
156 armadale - bedroom one - 14

Last of the panelling gone.

156 armadale - bedroom one - 15

Someone left us a message from when the windows were done!  Coincidentally, that’s my husband’s birthday and the year we moved to the village.

156 armadale - kitchen - 7

That’s two more window seats for the kitchen then 😀

156 armadale - kitchen - 8

And a VERY old copy of the Press & Journal twisted up blocking a draft.

156 armadale - misc - newspaper

It is starting to dawn on me that in a few months’ time I am going to have to decorate and furnish this house and I have no idea what I want to do with it.  Time to hit up RightMove and Pinterest for some ideas, I think.

One good piece of news, I had a revised council tax bill through yesterday – seems that they’ve decided to grant me the 50% discount after all.  Thank you very much, Highland Council!

A good week’s work

Mick and I have been cracking on with more panelling removal and we’re making slow but steady progress.  Pete the Roofer was going to bring David the Joiner round for a look this week, but Pete’s wife (who works with Mick) passed on a message that David has the lurgy that’s going round (or man-flu, as she put it!), so hopefully he’ll be recovered soon and able to come round and size the place up.

One of the nice things about spring starting to spring is that flowers are popping up all over the place outside:

156 armadale - outside 2 156 armadale - outside 1

Inside, we’ve depanelled the dormer window in bedroom two and found this – I think the initials may stand for Harry Macdonald, Ethel’s husband’s uncle (if I remember correctly), who left the house to her husband.  (EDIT:  Thanks to my friend Elizabeth, it may also be Hughie Mackay, her mother’s cousin, a joiner who worked on a lot of the houses in the village.)

156 armadale - bedroom two - 8

It’s amazing how much more space there is with the panelling taken out of the top of the dormer window alcove – that thin piece of wood was only to fix the panelling to, so hopefully we can leave it open and maybe put a small armchair in there for a quiet reading spot.

156 armadale - bedroom two - 7

One unwelcome find in this room (and it’s not very clear on the picture, but trust me, it’s there) was woodworm.  Lots of it.  On all the roof beams on the west-facing roof.  It’s live as well, a bit of sawdust came out of the holes when I banged the beams with a hammer, so that’ll all have to be soaked with treatment stuff.

156 armadale - bedroom two - 6

It was when I was working in this room and Mick was working in the little bedroom next door that we realised we could hear each other so clearly that we could have a conversation in normal voices, despite being in separate rooms.  As our target holiday guest is a family with young to teenage children, we thought that Mum and Dad might not appreciate the lack of soundproofing at bedtime (for any number of reasons!), so we stripped off some of the panelling on the internal walls to see what was inside.  Answer?  Sweet nothing – that wood is the back of the panelling on the other side, so we can’t take down both sides or we’ll remove all the internal walls!

156 armadale - bedroom two - 5

The only other thing we’ve done this week is break into the living room fireplace – Mick has done a great job and it looks like it’s been filled in with concrete and bricks, so we should be able to enlarge it for the woodburner fairly easily.

156 armadale - living room - 2

Whoomph!

Mick took the day off work yesterday, as he’s away for the long weekend and wanted to get some more work done.

Actually, scrap that, what my pyromaniac husband wanted to do was light the big pile of panelling and since the wind was coming from the south and not too strong and he was going to be outside repairing some of the fanks so I can dose the sheep tomorrow, it seemed like a good time to do it.

I’m not quite going to say ‘I told you so’, but I did express my reservations about setting light to something nearly as tall as the house in fairly dry conditions with both peat on the ground and an oil tank in the vicinity, so I did have a quiet chuckle when this appeared on his Facebook timeline:

Today’s job – rebuild and hang the gate on the fanks. Took me a while but got there. Also ran round like a looney with a bucket of water throwing it everywhere as the old wood panelling took to an inferno………

We’ve been working mainly in the second of the bigger bedrooms this week, stripping out more panelling.

156 armadale - bedroom two - 1

Old nails left behind from last time the roof was worked on.

156 armadale - bedroom two - 2

That’s one heck of a big stone!  Sitting just over the fireplace in that room.

156 armadale - bedroom two - 3

Back wall of the house.

156 armadale - bedroom two - 4

This fell out when I took the skirting board off.  Wonder what happened to the rest of the deck?  We also found a lot of hair grips!

156 armadale - living room - 1

And finally, I had a quick look under the tiles in the living room fireplace.

Good news on that front though, Pete the Roofer says that David the Joiner is on board and he’ll be bringing him over early next week to have a chat.

Budget Day

Not just for Mr Osborne, but I thought I’d add up how much I’ve spent to get here so far, as the solicitor’s bill arrived this afternoon.

The only two expenses I’ve had (not counting the running costs for my sheep – I’m keeping my crofting budget separate) are the interest on the money I’ve borrowed from my family and the legal fees, so the accounts so far look like this:

Difference between money borrowed and purchase price – £70.51
10th Nov – Interest – £96.68
10th Dec – Interest – £276.88
11th Jan – Interest – £276.88
10th Feb – Interest – £276.88
10th Mar – Interest – £276.88
16th Mar – Solicitor’s bill – £766.00
Total:  £2,040.71

So it’s cost me a little over £2,000 just to get the keys.  In fairness, that’s not bad – I had to sit down when I opened the solicitor’s letter, as I was expecting that to be four figures and possibly starting with a 2!  I shall drop in and pay it tomorrow and leave a large Easter egg for Jane, my solicitor 🙂

I had a call back from Dougie the electrician this afternoon – he was up the road in Melvich, could he come and have a look?  Sure.  The good news is that he’s agreed to quote for it, so I need to think about what I want in each room in terms of lighting and sockets (I don’t need to finalise positions just yet), think about where I want the TV and the phone, as he’s going to hide all the cabling currently tacked to the front of the house for those, and decide whether I want the power to the byre to be on a separate meter to the rest of the house.  He’s also going to move the position of and seriously upgrade the heating controls (it’s a cheap clockwork timer and the noise is really annoying) and move the meter and fusebox etc. – he’d seen that the main power cable into the house is chased into the harling down the outside wall and then goes through a wooden panel above the front door, which isn’t ideal, so since we’re getting the door replaced and we’ll have someone patching the non-harled bits that will be revealed when Pete takes the fascia boards off, it’s going to go through the wall at the height of the connection and all be hidden in a little cupboard on the landing.  Mick has suggested that we ask him to also quote for putting in outside lights, particularly one to illuminate the fanks (sheep handling system), and also for wiring in a back-up generator so that if we do have guests in and there’s a power cut, it’ll cut in and take over.  We actually have a generator here, but it’s not wired in, so it can go down the road.

Another two hours stripping out panelling and bedroom one is very nearly ready for work to start.  The priority over the next few days is to get the surfaces with the Veluxes/proposed Veluxes bare so that if Pete wants to start cutting holes in the roof next week it’s all ready to go.  I uncovered a MAHOOSIVE spider which I thought was dead, but turned out not to be.  Mick really Does Not Do spiders, so I had to dispose of it out of the bedroom window.